![]()
Construction will follow in October and the Ocean Harvester will be ready for deployment in Hanöbukten in March 2011. The purpose of this test is to verify the system functionality and survivability and measure the performance. The device will not be grid connected at this stage.

Andreas Josefsson presented Ocean Harvestings wave power technology at EWTEC,